Should I choose RPC Level 1 or the GVC?
It depends on what you want to fly.
If you'll be flying VLOS with no short-term plans for BVLOS, the GVC is still a valid route until 31 December 2027, and usually the more cost-effective one.
If you want to future-proof your training, or BVLOS is on your roadmap, RPC Level 1 makes more sense. It uses a structured, competency-based training framework and is the entry point to RPC-L2 and RPC-L3.
Related Questions
Is RPC Level 1 required for BVLOS operations?
RPC-L1 is the starting point. Its optional Part B covers BVLOS with Visual Mitigations; other BVLOS operations need RPC-L2 or RPC-L3, which build on RPC-L1.
Will my GVC still be valid after 2027?
Yes, until its own expiry date, where your Operational Authorisation accepts it. Renew before 31 December 2027 if you're eligible, or plan to convert to RPC-L1.
Is GVC a must for PDRA01?
No. For PDRA-01, the CAA accepts either a GVC or an RPC-L1, alongside a valid Flyer ID.