What's the difference between RPC-L1 Part A and Part B?
RPC-L1 Part A covers VLOS operations. Part B is optional and covers BVLOS operations using Visual Mitigations, where the risk is managed by visual means such as trained visual observers. You can gain RPC-L1 with Part A alone.
BVLOS without Visual Mitigations isn't permitted at Level 1 and needs a higher qualification, such as RPC-L2.
Related Questions
Is RPC Level 1 required for BVLOS operations?
RPC-L1 is the starting point. Its optional Part B covers BVLOS with Visual Mitigations; other BVLOS operations need RPC-L2 or RPC-L3, which build on RPC-L1.
Will my GVC still be valid after 2027?
Yes, until its own expiry date, where your Operational Authorisation accepts it. Renew before 31 December 2027 if you're eligible, or plan to convert to RPC-L1.
Is GVC a must for PDRA01?
No. For PDRA-01, the CAA accepts either a GVC or an RPC-L1, alongside a valid Flyer ID.