Do I need to write an Operations Manual for RPC Level 1?
No. Unlike GVC, RPC Level 1 candidates are trained and assessed against a standardised Operations Manual provided by the training provider, ie heliguy™. This reduces administration and ensures consistent procedures.
Related Questions
Is RPC Level 1 required for BVLOS operations?
RPC-L1 is the starting point. Its optional Part B covers BVLOS with Visual Mitigations; other BVLOS operations need RPC-L2 or RPC-L3, which build on RPC-L1.
Will my GVC still be valid after 2027?
Yes, until its own expiry date, where your Operational Authorisation accepts it. Renew before 31 December 2027 if you're eligible, or plan to convert to RPC-L1.
Is GVC a must for PDRA01?
No. For PDRA-01, the CAA accepts either a GVC or an RPC-L1, alongside a valid Flyer ID.