How should the DJI Dock be installed and configured?
The DJI Dock should be installed and configured by following this method:
Fix DJI Dock on a flat, level surface;
Connect the power cables to DJI Dock.
After it is fixed, connect DJI Dock to the network using a network cable or install DJI Cellular Module;
Quickly configure DJI Dock using the DJI RC Plus remote controller (RC).
Related Questions
How do I power on the backup battery of DJI Dock 3?
Press the button to power the backup battery if no grid power; otherwise, it powers on automatically.
What conditions will cause the cooling and heating functions of DJI Dock 3 to be automatically enabled or disabled?
The Dock 3 auto heats or cools based on temp; behaviour may adjust with firmware updates.
Can D-RTK 3 Relay Fixed Deployment Version be used independently without connecting to DJI Dock 3?
Currently no.